Zero → Do → Done.
Three moves take you from nothing in place to audit-ready: connect the systems you already run, let the agents work on a heartbeat, approve what they produced.
Zero to done in three moves.
- 01
Connect
Point Zero2Do at the systems you already run: cloud, code hosting, identity provider. Read-only access is enough, and there is nothing to install.
- Pick your frameworks; the controls and their cross-mappings load with them.
- Scopes are read-only, and every credential is encrypted at rest.
- The first evidence run starts as soon as the first system is connected.
- 02
Agents run on a heartbeat
The agents do not wait to be asked. On a schedule they pull evidence out of your systems, draft the policies your frameworks require, run control tests and chase acknowledgments.
- Evidence is collected and re-collected, so it never goes stale between audits.
- Policies are drafted against your environment, then reviewed by a second agent.
- Every action an agent takes is logged with what changed and why.
- 03
You approve
Each heartbeat ends in a short queue: the judgments only you can make. Approve a policy, confirm an exception, answer a question. The rest is already done.
- Gaps arrive ranked, with the work the agents have already completed attached.
- Approvals are recorded as audit trail, not as a separate spreadsheet.
- Nothing ships to your team or your auditor until you say so.
From day one to audit day.
The heartbeat compounds. Here is what has changed by each point, without anyone on your side chasing it.
Day 1
You see your real posture.
The workspace opens, the first systems connect and the first collection run finishes. Day one ends with measured coverage instead of a spreadsheet estimate.
Week 1
The program is running.
Policies are drafted against your frameworks, control tests have run at least once, gaps are ranked and the acknowledgment queue is out to your team.
Audit day
The package is already built.
Evidence, test results and current policies sit in the audit room organized by control. You export the package; nothing gets assembled the night before.
From zero to audit-ready in 30 days
See the three moves run against your own systems. You start at zero; the agents take the first turn.
- 01
Tell us where you are
Which frameworks you need, how many clients or environments, and what you already have in place.
- 02
Your workspace opens
Frameworks loaded, controls mapped, integrations ready for the credentials you choose to give.
- 03
The first heartbeat runs
Agents collect, draft and test straight away, and your first approval queue is waiting for you.